💠 Ethereum Prepares for Fusaka Hard Fork — Focus on Scalability and Gas Limits



Ethereum is moving into its next upgrade phase: the Fusaka hard fork is scheduled for November 2025, while Glamsterdam is set for proposal finalization on August 1.

📌 Fusaka Highlights: — Includes 11 EIPs, notably EIP-7825 (focused on protection and scaling)
— Proposal to raise the gas limit to 150 million, reducing transaction costs
— EIP-7907 and EVM Object Format were dropped to speed up development
— Devnet-3 launches on July 23, with mainnet rollout in early November

🔄 Next: Glamsterdam (2026): — Potential block time reduction from 12 to 6 seconds — a boost for DeFi
— Proposed gas limit cap at 45 million
— Final EIP decisions expected on August 1

📌 Context: These upgrades aim to strengthen Ethereum’s position against Solana and L2 solutions.
However, the fast pace and centralized nature of discussions are raising concerns — especially with Devconnect approaching.

The market is watching closely: Fusaka’s success could lay the foundation for Ethereum’s next DeFi growth cycle.
ETH2.73%
EARLY0.29%
DEFI3.45%
post-image
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Share
Comment
0/400
No comments
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate app
Community
English
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)